Clients | Description Of work | Remarks |
---|---|---|
Radian/Maaden | Earth work & Construction of Reinforcement Foundation, installation of PEB building- Civil Package for Dross Process Facility | Ongoing |
Saleem Agencies | Supply and Installation of security fences into PDH-PP-complex in 2ed Jubail industrial city casting and installation of foundation and grade beam for fence post in a manner consist with FGL( Finished Ground Level ) | Completed |
MASA/Marafiq | 06 No of pumping station access platform replacement at RO4 MASA Jubail | Completed |
NIGC-SABIC /SENDAN | Civil work at GAS phase IV Debottlenecking project : Complete Civil work and underground pipeline works, which includes , compressor shelter foundation , cable try support ,transformer room ,pipe rack foundation , chiller foundation, man hole , pump foundation concrete pavements , road crossing , supply &installation &glass proof doors , HVAC System | Completed |
SATROP | Civil work for Sulphur pipe line including goal post construction of new goal post for new Sulphur line | Completed |
SIPCHEM | HDPE piping , fire water network ,pump foundation raised floor system ,replacement of acid , resistant tiles in pond &pits, office modification , removal and replacement of the walk way tiles around al, building of Sipchem ,construction od additional office at CCB1 and engineering building. | Completed |
MARAFIQ | Supply and installation of perimeter fence (chain link) with double leaf gate complete with all accessories consisting of fence posts, PVC coated chain link fabric around 127 lift stations at Jubail community area asper RC standard | Completed |
AL BYRONI SABIC | Partition works in Urea bagging area including partitions work , modification of Masjid and toilet, tile works plumbing works and electrical works , construction of utility and boiler control room 2617&2618 including civil foundations ,wall, plastering, roofing, water proofing , interior , painting , flooring , water supply & drainage works , modification works of Urea bagging area including roofing works. | Completed |
MASA/MARAFIQ | Roofs replacement , office modification , glass partition in H/O and plants removal old shutter door and supply & installation of new shutter door at Masa | Completed |
LINDE Arabian Contracting Company | Construction of cold box foundations for e container ,salsa container , I container , diesel generator , BAS compressor, MAC compressor , Air filter Moisieve container, cooling tower , LOX tank and LAR tank , weigh bridge , pipe rack foundations and road works, SEC building work utility services such has HDPE piping or portable water , drainage /sewage networks including providing catch basin , manhole chamber and PVC piping , electrical network , construction of machine house , piling work , erection pf prefabricated structures for the machine house including wall &roof cladding , mounting of hall gates , steel doors and hall crane , installation of ventilation system including switch gear and interior lighting. | Completed |
CHEMANOL | Construction of chemical warehouses including the foundation , trenches underground utilities , walls , office room , toilets , cylinder storage area and erection of main structure including wall and roof sheeting and supplying , fabricate installation of steel structures for office room ,toilet , deep excavation work for repairing the underground cold water line including shoring , backfilling and reinstatement of asphalt road. | Completed |
SAUDI KAYAN NIGC | Civil work for switch gear room and structure works for economizer, modification of condenser pump structure | Completed |
NAVEL BASE | Construction of two storey office building | Completed |
ARABIAN AMINES/SAUDI ARAMCO | Construction of sales gas metering station and building facility | Completed |
APPC-SAMSUNG /SAUDI ARAMCO | Construction of proper gas & sales, gas metering station, battery rooms and fencing U/G pipelines in RC Area | Completed |
MARAFIQ | Construction of north west facility waste water building | Completed |
SAFCO &IBB | Piling works , providing cast in situ piling -5 nos of 500mm dia 15m depth and including integrity test , axial compressive load test , cross hole ultrasonic test and construction of foundation | Completed |
PETROKEMYA /OLAYAN DESCON | Construction of new I cold box foundation, breaking of piles, preparation of area for heavy lifting , construction of duct and trenches, underground pipe laying and various civil works | Completed |
THALES /APPC-SAMSUNG | Supply and installation of pre cast foundation for lighting pole camara pole, DCP, road blockers , raising arm barrier cable trenches and duct bank , asphalt work . | Completed |
SWCC JUBAIL | Rehabilitation of storage and maintenance building | Completed |
Qassim bulk plant ARAMCO | Vapor recovery unit Qassim bulk plant ARAMCO 16”6”,4” 1.2 KM CS PIPING | Completed |